Items where Division is "Teknik Sipil" and Year is 2025

Group by: Creators | Item Type | No Grouping
Jump to: A | L | N | P | W
Number of items: 6.

A

ARSANA, I GUSTI PUTU WAHYU DANA (2025) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PEMASANGAN DINDING BATA RINGAN DENGAN METODE WORK SAMPLING (Studi Kasus: Proyek Pembangunan Villa Selingsing). Other thesis, Universitas Mahasaraswati Denpasar.

L

LEMBANG, ALFIAN YUSUF RANTE (2025) ANALISIS KERUSAKAN JALAN RAYA PADA LAPIS PERMUKAAN DENGAN METODE PAVEMENT CONDITION INDEX (PCI) (Studi Kasus: Jalan Kenyeri Kota Denpasar). Other thesis, Universitas Mahasaraswati Denpasar.

N

NATALIA, PUTRI (2025) ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus : Pembangunan Unit Sekolah Baru (USB) SMAN 2 Sukawati (Lanjutan)). Other thesis, Universitas Mahasaraswati Denpasar.

NUGRAHA, DANNY SAPTA (2025) ANALISIS PERBANDINGAN BIAYA DAN WAKTU ANTARA PELAT LANTAI BESI BETON KONVENSIONAL DENGAN PELAT LANTAI BESI WIREMESH (STUDI KASUS : PROYEK PARKIRAN MOTOR UPPKB CIKANDE, SERANG). Other thesis, Universitas Mahasaraswati Denpasar.

P

PUTRA, I GEDE WAHYU DANA (2025) ANALISIS DATA DASAR DAN BIAYA PERBAIKAN PRASARANA PADA RUAS JALAN PROVINSI BALI MENGGUNAKAN SOFTWARE PKRMS (PROVINCIAL KABUPATEN ROAD MANAGEMENT SYSTEM). Other thesis, Universitas Mahasaraswati Denpasar.

W

WICAHYO, MUHAMMAD BAYU (2025) EVALUASI KINERJA JARINGAN IRIGASI DAERAH IRIGASI KACAGAN PADA DAERAH ALIRAN SUNGAI (DAS) TUKAD PENET DI KABUPATEN TABANAN. Other thesis, Universitas Mahasaraswati Denpasar.

This list was generated on Sun Oct 11 17:38:41 2026 WITA.