ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEMBANGUNAN KONSTRUKSI KAP BAJA RINGAN DENGAN KAP KAYU ( Studi Kasus : Private Villa Kedungu, Kediri, Tabanan )

SEPTIAWAN, I PUTU ADI (2022) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEMBANGUNAN KONSTRUKSI KAP BAJA RINGAN DENGAN KAP KAYU ( Studi Kasus : Private Villa Kedungu, Kediri, Tabanan ). Other thesis, Universitas Mahasaraswati Denpasar.

[thumbnail of Abstrak] Text (Abstrak)
R.320 FT ABSTRAK.pdf - Other

Download (364kB)
[thumbnail of BAB I-II] Text (BAB I-II)
R.320 FT BAB I-II.pdf - Other

Download (4MB)
[thumbnail of FULL TEXT] Text (FULL TEXT)
R.320 FT.pdf - Other
Restricted to Registered users only

Download (27MB)

Abstract

Abstrak

Konstruksi rangka atap adalah bagian atas dari suatu bangunan yang merupakan struktur rangka batang yang diletakkan pada sebuah bidang dan saling dihubungkan dengan sendi pada ujungnya, sehingga membentuk suatu bagian bangunan yang terdiri dari segitiga-segitiga dengan material yang umumnya dipakai adalah kayu. Kelangkaan akan kayu membuat harga kayu mahal. Salah satu dampaknya yaitu konstruksi rangka atap yang memakai kayu membuat harga pekerjaan atap membengkak. Dari permasalah ini, alternatif penggunaan material untuk rangka atap yaitu baja ringan karena sifatnya yang kuat dan masih gampang dicari. Tujuan penelitian ini adalah mengetahui perbandingan biaya dan waktu konstruksi kap kayu dengan kap baja ringan dengan mengambil studi kasus Private Villa Kedungu, Kediri, Tabanan, untuk mengetahui material yang lebih ekoonomis (biaya) dan lebih cepat pengerjaannya/ efisien (waktu). Analisis biaya menggunakan Analisa Harga Satuan Pekerjaan (AHSP) Kab. Badung 2021 dan analisis waktu menggunakan koefisien pekerjaan yang kemudian diolah dengan metode komparatif kuantitatif. Dari hasil penelitian yang telah dilakukan, dapat disimpulkan pekerjaan kap baja ringan lebih murah pada pekerjaan kap kayu dengan total biaya untuk kap baja ringan yaitu Rp. 165.535.000, sedangkan untuk kap kayu total biayanya yaitu Rp. 206.614.000. semntara itu dari segi perbandingan waktu, pekerjaan kap baja ringan lebih cepat pengerjaannya dengan durasi 18 hari kerja, sedangkan pekerjaan kap kayu 24 hari kerja.

Abstract

Structure roof construction is the upper part of a building which is a rod trusses structure that is placed on a plane and interconnected with joints at the end, thus forming a part of the building consisting of triangles with generally used the woods materials. The scarcity of wood makes the price of wood expensive. One of the impacts is that the construction of roof trusses that use wood makes the price of roofing work growth. From this problem, the alternative use of material for the roof trusses is light steel because of its strong nature and is still easy to find. The purpose of this study is to find out the comparison of the cost and time for construction of materials wooden with light steel by taking a case study of Private Villa Kedungu, Kediri, Tabanan, to find out materials that are more economical (cost) and faster to work on / efficient (time). Cost analysis using Analisa Harga Satuan Pekerjaan (AHSP) of Badung Regency 2021 and time iv analysis using work coefficients and then processed by quantitative comparative methods. From the results of the research that has been carried out, it can be concluded that light steel structure work is cheaper on wooden structure work with a total cost for a light steel of Rp. 165,535,000, while for a wooden the total cost is Rp. 206,614,000. In terms of time comparison, the work of the light steel structure is faster to work with a duration of 18 working days, while the wooden structure work is 24 working days.

Item Type: Thesis (Other)
Additional Information: R.320 FT / 2022
Uncontrolled Keywords: Rangka Atap, Kayu, Baja Ringan, Biaya,& Waktu
Subjects: F. TEKNIK > Konstruksi Rangka Atap
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Unnamed user with email [email protected]
Date Deposited: 04 May 2023 03:48
Last Modified: 04 May 2023 03:48
URI: http://eprints.unmas.ac.id/id/eprint/3138

Actions (login required)

View Item
View Item