LARASHATI, NI PUTU OKKY (2022) ANALISIS WAKTU PENYELESAIAN PROYEK AKIBAT TERJADINYA CONTRACT CHANGE ORDER (CCO) DENGAN METODE TRACKING MENGGUNAKAN PROGRAM MICROSOFT PROJECT (Studi Kasus Peningkatan Jalan PenelokanMalet, Jalan Tiga-Linjong-Penyebeh dan Jalan Tanggahan-Serokadan). Other thesis, UNIVERSITAS MAHASARASWATI DENPASAR.
R. 296 FT Abstrak.pdf - Other
Download (178kB)
R. 296 FT Bab I & II.pdf - Other
Download (6MB)
R. 296 FT.pdf - Other
Restricted to Registered users only
Download (17MB)
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | R/296/FT-SIP/2022 |
| Uncontrolled Keywords: | Contract Change Order, Waktu, Tracking, Microsoft Project |
| Subjects: | F. TEKNIK |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Unnamed user with email [email protected] |
| Date Deposited: | 12 Jan 2023 03:33 |
| Last Modified: | 27 Jan 2023 04:57 |
| URI: | http://eprints.unmas.ac.id/id/eprint/2132 |
