ANALISIS WAKTU PENYELESAIAN PROYEK AKIBAT TERJADINYA CONTRACT CHANGE ORDER (CCO) DENGAN METODE TRACKING MENGGUNAKAN PROGRAM MICROSOFT PROJECT (Studi Kasus Peningkatan Jalan PenelokanMalet, Jalan Tiga-Linjong-Penyebeh dan Jalan Tanggahan-Serokadan)

LARASHATI, NI PUTU OKKY (2022) ANALISIS WAKTU PENYELESAIAN PROYEK AKIBAT TERJADINYA CONTRACT CHANGE ORDER (CCO) DENGAN METODE TRACKING MENGGUNAKAN PROGRAM MICROSOFT PROJECT (Studi Kasus Peningkatan Jalan PenelokanMalet, Jalan Tiga-Linjong-Penyebeh dan Jalan Tanggahan-Serokadan). Other thesis, UNIVERSITAS MAHASARASWATI DENPASAR.

[thumbnail of Abstrak] Text (Abstrak)
R. 296 FT Abstrak.pdf - Other

Download (178kB)
[thumbnail of Bab I & II] Text (Bab I & II)
R. 296 FT Bab I & II.pdf - Other

Download (6MB)
[thumbnail of Full Text] Text (Full Text)
R. 296 FT.pdf - Other
Restricted to Registered users only

Download (17MB)
Item Type: Thesis (Other)
Additional Information: R/296/FT-SIP/2022
Uncontrolled Keywords: Contract Change Order, Waktu, Tracking, Microsoft Project
Subjects: F. TEKNIK
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Unnamed user with email [email protected]
Date Deposited: 12 Jan 2023 03:33
Last Modified: 27 Jan 2023 04:57
URI: http://eprints.unmas.ac.id/id/eprint/2132