Items where Subject is "Proyek Konstruksi"

Group by: Creators | Item Type
Jump to: A | D | L | N | W
Number of items at this level: 6.

A

AMA, ADRIANUS TAMO (2021) ANALISIS PROYEKSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE EARNED VALUE MANAGEMENT (Studi Kasus: Proyek Rehabilitasi Jalan Dan Pembangunan Jembatan Siangan-Lokasrana). Other thesis, Universitas Mahasaraswati Denpasar.

ARSANA, I GUSTI PUTU WAHYU DANA (2025) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PEMASANGAN DINDING BATA RINGAN DENGAN METODE WORK SAMPLING (Studi Kasus: Proyek Pembangunan Villa Selingsing). Other thesis, Universitas Mahasaraswati Denpasar.

D

DANUARTHA, I PUTU NGURAH (2026) ANALISIS PRODUKTIVITAS TENAGA KERJA KONSTRUKSI PADA PEKERJAAN PEMASANGAN BATA RINGAN MENGGUNAKAN MPDM (METHOD PRODUCTIVITY DELAY MODEL)(Studi Kasus: Pembangunan Gedung A Puspem Gianyar). Other thesis, UNIVERSITAS MAHASARASWATI DENPASAR.

L

Lomy, Rosita Deliyanti (2023) Analisis Perbandingan Biaya Sumber Daya Kegiatan Rencana dan Realisasi Proyek berbasis Microsoft Project (studi kasus: Proyek Pembangunan Embung Serbaguna di Kabupaten Sumba Timur). Other thesis, Universitas Mahasaraswati Denpasar.

N

NATALIA, PUTRI (2025) ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus : Pembangunan Unit Sekolah Baru (USB) SMAN 2 Sukawati (Lanjutan)). Other thesis, Universitas Mahasaraswati Denpasar.

W

Wea, Clarita Patricia (2024) Manajemen Risiko Pada Proyek Konstruksi (Studi Kasus : Proyek Pembangunan Gedung SMP Negeri 16 Denpasar). Other thesis, Universitas Mahasaraswati Denpasar.

This list was generated on Sun Nov 1 16:41:29 2026 WITA.