MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN JALAN DI ATAS SUNGAI MATI, KECAMATAN KUTA, KABUPATEN BADUNG, PROVINSI BALI

PUTRA, I KADEK DWIRA (2023) MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN JALAN DI ATAS SUNGAI MATI, KECAMATAN KUTA, KABUPATEN BADUNG, PROVINSI BALI. Other thesis, Universitas Mahasaraswati Denpasar.

[thumbnail of Abstrak] Text (Abstrak)
R.326 FT ABSTRAK.pdf - Other

Download (242kB)
[thumbnail of BAB I-II] Text (BAB I-II)
R.326 FT BAB I-II.pdf - Other

Download (3MB)
[thumbnail of FULL TEXT] Text (FULL TEXT)
R.326 FT.pdf - Other
Restricted to Registered users only

Download (14MB)

Abstract

Abstrak

Perencanaan Proyek Pembangunan Jalan di atas Sungai Mati, Kecamatan Kuta, Kabupaten Badung, Provinsi Bali dilakukan untuk menambah alternatif jalan dan mempermudah akses transportasi di daerah tersebut dan untuk mengatasi kemacetan lalu lintas simpang Jalan Raya Kuta - Jalan Blambangan. Rencana pelaksanaan Proyek Pembangunan Jalan di atas Sungai Mati, Kecamatan Kuta, Kabupaten Badung, Provinsi Bali memiliki berbagai macam risiko yang mungkin terjadi. Manajemen risiko diperlukan untuk meminimalisir dampak dan kemungkinan risiko yang akan terjadi pada proyek Pembangunan Jalan di atas Sungai Mati, Kecamatan Kuta, Kabupaten Badung, Provinsi Bali. Metode pada penelitian ini menggunakan metode deskriptif kualitatif yaitu wawancara dan brainstorming terhadap pihak yang berkompeten serta pihak yang terlibat dalam Proyek Pembangunan Jalan di atas Sungai Mati, Kecamatan Kuta, Kabupaten Badung, Provinsi Bali dengan total 25 responden. Setiap responden memberikan jawaban mengenai kemungkinan terjadinya suatu risiko (likelihood) dan dampak/pengaruh yang terjadi akibat risiko tersebut (consequences), kemudian dari hasil yang diperoleh dari responden akan mendapatkan penilaian risiko dengan cara mengalikan nilai modus dari frekuensi/kemungkinan terjadinya risiko (likelihood) dengan nilai modus pengaruh/dampak risiko (consequences). Dalam penelitian ini mendapatkan 34 identifikasi risiko. Risiko-risiko tersebut diantaranya 6 (17,65 %) risiko unacceptable, 21 (61,76%) risiko undesirable, 7 (20,59%) risiko acceptable, dan 0% atau tidak ada risiko yang tergolong negligible (dapat diabaikan). Untuk risiko yang tergolong major risk (unacceptable dan undesirable) dilakukan pengalokasiankepemilikan risiko dan mitigasi risiko. Kepemilikan risiko terbesar terdapat pada pihak Kontraktor yaitu sebanyak 4 (empat) risiko dengan kategori unacceptable (tidak dapat diterima) dan 17 (tujuh belas) risiko dengan kategori undesirable (tidak diharapkan). Jumlah penanganan atau mitigasi risiko yang dilakukan yaitu sebanyak 6 mitigasi risiko untuk risiko dengan kategori unacceptable (tidak dapat diterima) dan 21 mitigasi risiko untuk risiko dengan kategori undesirable (tidak diharapkan).

Abstract

The planning of the Road Construction Project over the Mati River, Kuta District, Badung Regency, Bali Province is carried out to add alternative roads and facilitate access to transportation in the area and to overcome traffic congestion at the Jalan Raya Kuta - Jalan Blambangan intersection. The implementation plan of the Road Construction Project over the Mati River, Kuta District, Badung Regency, Bali Province has various risks that may occur. Risk management is needed to minimize the impact and possibility of risks that will occur in the Road Construction project over the Dead River, Kuta District, Badung Regency, Bali Province. The method in this research uses a qualitative descriptive method, namely interviews and brainstorming with competent parties and parties involved in the Road Construction Project over the Dead River, Kuta District, Badung Regency, Bali Province with a total of 25 respondents. Each respondent provides answers regarding the likelihood of a risk occurring (likelihood) and the impact/influence that occurs due to the risk (consequences), then from the results obtained from the respondents will get a risk assessment by multiplying the mode value of the frequency/probability of risk occurrence (likelihood) with the mode value of the influence/impact of risk (consequences). In this study, 34 risk identifications were obtained. These risks include 6 (17.65%) unacceptable risks, 21 (61.76%) undesirable risks, 7 (20.59%) acceptable risks, and 0% or no risks classified as negligible. For risks classified as major risks (unacceptable and undesirable), risk ownership and risk mitigation are allocated. The largest risk ownership lies with the Contractor, namely 4 (four) risks with the unacceptable category and 17 (seventeen) risks with the undesirable category. The number of risk handling or mitigation carried out is

Item Type: Thesis (Other)
Additional Information: R.326 FT / 2023
Uncontrolled Keywords: Risiko, Identifikasi, Penilaian, Mitigasi, Jalan di atas Sungai Mati
Subjects: F. TEKNIK > Mitigasi
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Unnamed user with email [email protected]
Date Deposited: 05 May 2023 02:28
Last Modified: 05 May 2023 02:28
URI: http://eprints.unmas.ac.id/id/eprint/3163