Yuesti, Anik and Putri, Rizqy Amalia and Hazim, Hussein Tuama and Hendrixon, Oleg N. Polukhin and Ahmad, Israr and Chen, Tzu-Chia and Hoi, Vo Hoang Ca, Huynh Tan and Aravindhan, Surendar (2022) Application of Forest Optimization Algorithm for the Resource Constraint Project Scheduling. Industrial Engineering & Management Systems, 21 (2). pp. 313-321. ISSN 1598-7248
![[thumbnail of Article of Application of Forest Optimization Algorithm for the Resource Constraint Project Scheduling]](https://eprints.unmas.ac.id/style/images/fileicons/text.png)
Syarat khusus 5.pdf - Published Version
Download (514kB)
![[thumbnail of Turnitin of Application of Forest Optimization Algorithm for the Resource Constraint Project Scheduling]](https://eprints.unmas.ac.id/style/images/fileicons/text.png)
Hasil turnitin Syarat khusus 5 Application of Forest Optimization.pdf - Published Version
Download (2MB)
![[thumbnail of Peer Review of Application of Forest Optimization Algorithm for the Resource Constraint Project Scheduling]](https://eprints.unmas.ac.id/style/images/fileicons/text.png)
Aplication of Forest.pdf - Published Version
Download (769kB)
Abstract
Project scheduling is one of the most complex yet important issues in project-based planning. Scheduling is a topic that has entered the project from the production space and has been considered by many researchers in recent years. This problem has always faced many challenges due to its complex limitations in the real world. One of these issues is resource scheduling, known in optimization as the RCPSP problem. The study's main aim is to investigate the application of a forest optimization algorithm for resource constraint project scheduling. In this research, the RCPSP problem is optimized. A mathematical model is then proposed and then optimized using meteorological algorithms for forest optimization and refrigeration simulation. A hybrid meta-algorithm has also been developed for this document. Examination and comparisons of this algorithm show that the proposed method has the necessary efficiency both in terms of speed and quality of solutions.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Project Optimization, Project Scheduling, Forest Algorithm, Refrigeration Simulation Algorithm |
Subjects: | F. EKONOMI DAN BISNIS |
Divisions: | Fakultas Ekonomi dan Bisnis |
Depositing User: | Unnamed user with email [email protected] |
Date Deposited: | 06 Aug 2022 02:12 |
Last Modified: | 06 Aug 2022 02:12 |
URI: | http://eprints.unmas.ac.id/id/eprint/1342 |