Items where Subject is "Time Cost Trade Off"

Group by: Creators | Item Type
Jump to: Thesis
Number of items at this level: 2.

Thesis

JERAMU, YOHANES VALDIANO KRISTANTO (2024) ANALISIS PERCEPATAN WAKTU PROYEK KONSTRUKSI DENGAN METODE TIME COST TRADE OFF ( Studi Kasus : Proyek Pembangunan Rumah Susun Yayasan Sukmabar Kevikepan Labuan Bajo Seminar Menengah St. Yohanes Paulus II). Other thesis, Universitas Mahasaraswati Denpasar.

JUNIAWAN, I MADE (2024) ANALISIS PERCEPATAN WAKTU PELAKSANAAN PROYEK DENGAN METODE TCTO (TIME COST TRADE OFF) (Studi Kasus: Pembangunan Gedung 2A RSU Bangli). Other thesis, Universitas Mahasaraswati Denpasar.

This list was generated on Mon Apr 21 01:59:22 2025 WITA.