Items where Subject is "Keterlambatan Proyek"

Group by: Creators | Item Type
Jump to: Thesis
Number of items at this level: 3.

Thesis

DWIPAYANA, I KADEK KRISNA (2022) ANALISIS PENGARUH PERCEPATAN WAKTU PELAKSANAAN TERHADAP BIAYA (TIME COST TRADE OFF) BERBASIS MICROSOFT PROJECT (Studi Kasus: Pembangunan Gedung Lt.III (6 RKB, Tangga) SDN 2 Panjer). Other thesis, Universitas Mahasaraswati Denpasar.

PUTRI, I GUSTI AYU ARISTA (2022) MONITORING DAN EVALUASI WAKTU PELAKSANAAN PROYEK DENGAN METODE TRACKING (STUDI KASUS PEMBANGUNAN RUANG PERAWATAN WING UTARA TAHAP 1 RSU PAYANGAN). Other thesis, Universitas Mahasaraswati Denpasar.

SUSILA, SI MADE RAI ADI (2023) ANALISIS BIAYA DAN WAKTU PERCEPATAN PROYEK DENGAN PENAMBAHAN JAM KERJA LEMBUR MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) (Studi Kasus : Proyek Pembangunan Rumah Jabatan Wakapolda Bali). Other thesis, Universitas Mahasaraswati Denpasar.

This list was generated on Sat Apr 19 16:56:11 2025 WITA.