Items where Subject is "Jadwal Umur Proyek"

Group by: Creators | Item Type
Jump to: D | K | M | W
Number of items at this level: 4.

D

DWIYANTI, NI MADE MEILAN FLORENZIA (2023) ANALISIS PERBANDINGAN RENCANA WAKTU PELAKSANAAN ANTARA METODE KONVENSIONAL DENGAN APLIKASI MICROSOFT PROJECT (Studi Kasus: Pembangunan Gedung Dua Lantai SDN 1 Pedungan). Other thesis, Universitas Mahasaraswati Denpasar.

K

KUSUMA, I KADEK ANOK CHANDRA (2022) ANALISIS PENJADWALAN UMUR PROYEK DENGAN PRECEDENCE DIAGRAM METHOD (PDM) PADA PERENCANAAN PEMBANGUNAN GEDUNG RUMAH SAKIT NUSA PENIDA. Other thesis, Universitas Mahasaraswati Denpasar.

M

MULIANI, NI NYOMAN (2022) ANALISIS PENGARUH PERCEPATAN PENJADWALAN DENGAN METODE FAST TRACK BERBASIS MICROSOFT PROJECT TERHADAP SUMBER DAYA MANUSIA (Studi Kasus: Pembangunan Rusun Aspol Sanglah T.36 Bertingkat 4 Lantai). Other thesis, Universitas Mahasaraswati Denpasar.

W

WINTARI, NI MADE DWIJAYANTI (2022) ANALISIS OPTIMALISASI KETERSEDIAAN SUMBER DAYA MANUSIA DENGAN MENERAPKAN RESOURCE LEVELING BERBASIS MICROSOFT OFFICE PROJECT 2007 (Studi Kasus: Pembangunan Rusun Aspol Sanglah T.36 Bertingkat 4 Lantai). Other thesis, Universitas Mahasaraswati Denpasar.

This list was generated on Sat Apr 19 16:56:11 2025 WITA.