Items where Author is "JUNIAWAN, I MADE"
Group by: Item Type | No Grouping
Number of items: 1.
JUNIAWAN, I MADE (2024) ANALISIS PERCEPATAN WAKTU PELAKSANAAN PROYEK DENGAN METODE TCTO (TIME COST TRADE OFF) (Studi Kasus: Pembangunan Gedung 2A RSU Bangli). Other thesis, Universitas Mahasaraswati Denpasar.