Items where Subject is "Keterlambatan Proyek"

Group by: Creators | Item Type
Jump to: D | P | S
Number of items at this level: 3.

D

DWIPAYANA, I KADEK KRISNA (2022) ANALISIS PENGARUH PERCEPATAN WAKTU PELAKSANAAN TERHADAP BIAYA (TIME COST TRADE OFF) BERBASIS MICROSOFT PROJECT (Studi Kasus: Pembangunan Gedung Lt.III (6 RKB, Tangga) SDN 2 Panjer). Other thesis, Universitas Mahasaraswati Denpasar.

P

PUTRI, I GUSTI AYU ARISTA (2022) MONITORING DAN EVALUASI WAKTU PELAKSANAAN PROYEK DENGAN METODE TRACKING (STUDI KASUS PEMBANGUNAN RUANG PERAWATAN WING UTARA TAHAP 1 RSU PAYANGAN). Other thesis, Universitas Mahasaraswati Denpasar.

S

SUSILA, SI MADE RAI ADI (2023) ANALISIS BIAYA DAN WAKTU PERCEPATAN PROYEK DENGAN PENAMBAHAN JAM KERJA LEMBUR MENGGUNAKAN METODE TIME COST TRADE OFF (TCTO) (Studi Kasus : Proyek Pembangunan Rumah Jabatan Wakapolda Bali). Other thesis, Universitas Mahasaraswati Denpasar.

This list was generated on Sat Feb 15 05:56:52 2025 WITA.